Case
Old electrical installation in a new look

Client
Wastewater Treatment / AquaplusPurpose
Onze customer, Aquaplus, is responsible for the operational management of the water treatment plant at Colruyt Group and Barry Callebaut Belgium N.V.
After more than 20 years of service, the installation has become outdated, with an increasing risk of malfunctions and failures. In addition, several components are no longer readily available. An upgrade of the electrical installation and control system is now essential.

Challenge
A complete rebuild in just 3 days — now that’s a real challenge.
Within this short timeframe, we replace 7 meters of low-voltage panels and implement a brand-new control system. At the same time, we ensure that the most critical systems remain operational throughout the process.
This tight turnaround allows the client to temporarily buffer the wastewater, eliminating the need for a permit to discharge untreated wastewater.

Approach
The assembly and wiring of the new low-voltage panels took place in our own workshop. In parallel, we also programmed the PLC control and SCADA system.
Before transporting the new panels to the site, the entire installation was thoroughly tested.
Result
In just three days, this wastewater treatment plant underwent a complete transformation! The installation is now fully up to date electrically and equipped with the latest technology. Our client no longer has to worry about potential failures caused by outdated components.

Do you have a similar project?